Intake & makeup
Characterize incoming water before choosing a monitoring point.
Follow your cooling water through the plant.
Explore residual monitoring at intake, cooling circuits and blowdown. Build the specification around the water source, treatment chemistry and the decisions made in the control room.
Discuss your application
Characterize incoming water before choosing a monitoring point.
Distinguish once-through and recirculating requirements.
Review the DCS interface, signal quality and operating response.
Establish incoming chemistry.
Select a representative residual measurement point.
Review treatment response and discharge requirements.
Conceptual monitoring sequence. Final placement, detection limits and control actions must be reviewed for your water and equipment.
Separate intake, recirculating cooling and blowdown measurement objectives. Selection depends on the oxidant, salinity, temperature, fouling and control-system interface at each point. Cooling-water monitoring does not establish suitability for boiler water or discharge reporting.
Planning sequence; this is not a piping or control drawing.
Record freshwater, brackish or seawater conditions and the actual oxidant.
Check temperature, pressure, representative sample delivery and safe service access.
Define DCS signal scaling, data-quality flags and loss-of-signal response.
Record the tested model, configuration, reference method, dates and conditions. A utility case study does not validate a different water matrix.
Bring these questions to your application review.
Cooling-water evaluation does not establish boiler-water suitability. Confirm materials and performance for the actual water chemistry before specifying a model.
Tell us what you need to measure. We’ll help you find the right starting point.