ENGINEERED FOR WATER. BUILT FOR THE FIELD.
My Halogen Track an order Cloud login
Halogen Systems
FIELD PLANNING · R1 · OCTOBER 12, 2026

Make commissioning and verification repeatable.

Use these preparation checklists alongside the installation manual for your exact model and firmware. They do not replace a site work procedure, terminal diagram or an approved reference method.

Plan a measurable pilot

  1. Record site, sensor model, serial number, firmware, mounting and water chemistry.
  2. Define the required range, response and action threshold; distinguish resolution from detection capability.
  3. Select the reference method and agree on sampling location, timing and acceptance criteria.
  4. Record paired measurements, operating conditions, missing data and service work.
  5. Document the decision and the limits of the result before extending it to other sites.

Prepare a wet-tap installation

  1. Identify the approved sensor, insertion/removal assembly and the manual that applies.
  2. Have the responsible installer verify pipe, corporation stop, pressure, access and the site work procedure.
  3. Plan safe access, isolation and retrieval using the approved installation instructions.
  4. After installation, check the completed assembly and compare readings with the agreed reference method.

Prepare D20 wiring and integration

  1. Match the controller and sensor firmware to the current wiring and configuration manual.
  2. Confirm power supply, terminal assignments and interface hardware from that manual.
  3. Record signal scaling, units, Modbus addresses and data-quality handling in the site configuration record.
  4. Have qualified personnel perform wiring; test communications and the receiving system with a controlled commissioning procedure.

Commission a remote monitoring point

  1. Select the low-power sensor, BTSB variant, battery and approved installation.
  2. Record usable battery capacity, measurement duty cycle, reporting frequency, coverage and planned reserve.
  3. Verify timestamps and readings at the destination; test missing-report notifications as well as value alarms.
  4. Assign service, battery and reference-verification responsibilities.

Download a blank pilot record (CSV) →

Find the matching manual → · Watch available training videos → · Ask support →