ENGINEERED FOR WATER. BUILT FOR THE FIELD.
775.832.0495My Halogen Track an order Cloud login
Halogen Systems
play_circleVideo Library

Videos

Product demos, installation walkthroughs, and maintenance guides for Halogen sensors and controllers.

Technology Training

In-depth technology education with Dr. Strahand

Technology Training

Total Chlorine Monitoring with Dr. Chlorine

Learn about total chlorine monitoring from Dr. Chlorine (Dr. Strahand). Halogen Systems manufactures advanced amperometric chlorine analyzers for water and wastewater treatment.

Product Training & Demos

Installation, calibration, troubleshooting, and maintenance guides

Product Overview

Municipal & Industrial Product Overview

A comprehensive walkthrough of Halogen Systems water treatment sensors for municipal and industrial applications.

Product Overview

Display & Controller Product Overview

Overview of the D20 controller and display options for Halogen chlorine analyzers, including setup and configuration.

Product Training

System Startup & Function Testing

Essential procedures for chlorine analyzer startup and function testing. Covers power-on, sensor pairing, and initial verification.

Product Training

Reference Calibration & Calibration Defaults

How to perform reference calibration against a DPD grab sample and understand calibration default settings.

Product Training

Restoring Factory Calibrations & Long Menu Functionality

Guide to restoring factory calibrations and navigating the controller long menu for advanced configuration.

Product Training

Programming Sensor Firmware

Step-by-step guide to programming and updating sensor firmware on Halogen chlorine analyzers.

Troubleshooting

Troubleshooting Sensor Communication

In-depth tutorial on establishing and troubleshooting sensor communication with the D20 controller.

Maintenance

Non-Hazardous Sensor Wear-Parts Replacement

How to replace the annual wear-parts kit on Halogen sensors. Covers bead replacement, impeller inspection, and reassembly.

Upcoming Videos

Coming Soon
plumbing
play_arrow
Installation
Coming Soon

MP-5F Wet-Tap Installation Walkthrough

Step-by-step guide to installing the MP-5F sensor directly into a live pressurized pipe using the wet-tap fitting.

Use the text preparation checklist →

settings_input_component
play_arrow
Setup
Coming Soon

D20 Controller Setup & 4-20mA Output Wiring

Connecting the D20 controller to SCADA or a data logger via the 4-20mA analog outputs.

Use the text preparation checklist →

cell_tower
play_arrow
Remote Monitoring
Coming Soon

Remote Monitoring with Cellular IIoT

Setting up the battery-powered cellular kit for unattended operation at remote sites.

Use the text preparation checklist →

Need help right now?

Our engineering team can walk you through installation or setup live.

PUT THE DOCUMENTATION TO WORK

Plan the system and record the result.

Field checklists

Prepare a pilot, wet-tap installation, D20 integration or remote site. Download a blank pilot record.

Use the checklists →