High-Iron Water Evaluation · United Kingdom
Compton Durville, Wessex Water, UK
The Compton Durville report evaluates MP5 monitoring in high-iron borehole water and investigates fouling of the incumbent chlorine sensor. The MP5 was used for independent monitoring, not dosing control.
What the source reports
- check_circleThe report describes five months with no MP5 calibration or maintenance intervention.
- check_circleIts data analysis covers 73 operational cycles in a stated 65-day dataset.
- check_circleThe report interprets rising chlorine residuals as evidence consistent with fouling-related dosing compensation.