ENGINEERED FOR WATER. BUILT FOR THE FIELD.
775.832.0495My Halogen Track an order Cloud login
Halogen Systems

High-Iron Water Evaluation · United Kingdom

Compton Durville, Wessex Water, UK

The Compton Durville report evaluates MP5 monitoring in high-iron borehole water and investigates fouling of the incumbent chlorine sensor. The MP5 was used for independent monitoring, not dosing control.

What the source reports

  • check_circleThe report describes five months with no MP5 calibration or maintenance intervention.
  • check_circleIts data analysis covers 73 operational cycles in a stated 65-day dataset.
  • check_circleThe report interprets rising chlorine residuals as evidence consistent with fouling-related dosing compensation.

Read the original account

Compton Durville, Wessex Water, UK — Case Study | Halogen Systems