ENGINEERED FOR WATER. BUILT FOR THE FIELD.
775.832.0495My Halogen Track an order Cloud login
Halogen Systems

FREE CHECKLIST · COOLING TOWERS

Give every tower reading a clear job

A 2-page field checklist and printable log covering makeup, recirculating loop and blowdown monitoring: chemistry questions, point selection, commissioning and how to respond when the trend moves.

What's inside

  • ✓Know the chemistry first — biocide formulation, additives, residual range, temperature and conductivity
  • ✓One job per point — makeup, recirculating loop, blowdown/controls
  • ✓Pre-spec checklist — for any online sensor
  • ✓Commissioning steps — reference checks, scaling, alarms, loss-of-signal
  • ✓Trend-response table — what you see, first checks, what to consider
  • ✓Printable log sheet — with online vs reference columns

Free download

Get the checklist

PDF checklist + log sheet. Hand it to your customers.

Checklist

Cooling Tower Residual & Blowdown Checklist

By submitting this form, you agree to our Privacy Policy and consent to Halogen Systems contacting you about your inquiry. We do not sell your personal information.

  • Method-focused: built from Halogen’s cooling-tower and power-plant application guidance
  • Reagent-free, direct in-line measurement options: MP-5F and MP-HOT
  • Residual monitoring doesn’t detect Legionella; the checklist says so

Who it's for

Water treatment service reps who want a branded, useful leave-behind, plus plant and facility engineers planning residual monitoring on towers.

Treatment rep with several sites? Talk to us about an application review for your customers’ towers.

Plan an application review
Help me choose a sensor