Wastewater Reclamation Plant Success Story!

Another Halogen Systems success story! The Iron Bridge Regional Wastewater Reclamation Plant (Iron Bridge WRP) recently trialed the Halogen Systems MP5™ in a parallel loop to their existing sensor array. Reclaimed water is especially tough on Chlorine sensors, and their previous sensors needed calibration once per shift—3 times per day per sensor. Halogens MP5™ has been accurate for over 3 months with no calibration.